  Project Name Year Description Client
Construction of Drinking Water System for the Arac & Cavuskoy Villages in Kastamonu 1963 Construction of Drinking Water System for the Arac & Cavuskoy Villages in Kastamonu GENERAL MANAGEMENT OF STATE WATER WORKS
Fuel Pipelines for 10 airports & modifications of Tanker Loading Stations 1964 Line, Modification Extension of New Pipe & Updating MINISTRY OF PUBLIC WORKS General Management of Construction of Airports & Fuel Installations
Construction of Apron Extension at Diyarbakir Airport. 02/08/1966 5,000m2 25cm thick Concrete Apron MINISTRY OF PUBLIC WORKS General Management of Construction of Airports & Fuel Installations
Breemse & Liquid Oxygen Installations at Merzifon Airport. 07/07/1967 Construction & Erection of a complete liquid oxygen & breemse Plant and Pumps, Transformer & Electric Installations Construction & Erection of a complete liquid oxygen & breemse Plant and Pumps, Transformer & Electric Installations
Miscellaneous Works at various Fuel Plants 09/11/1967 Miscellaneous Works at various Fuel Plants Miscellaneous Works at various Fuel Plants
Construction of Water Pipelines for Fertilizer Plant, Mersin 15/03/1970 20"diam., 4,264m. Long Spiral Welded Steel Water Pipeline & 317m. Delicay River Crossing in Concrete Casing 20"diam., 4,264m. Long Spiral Welded Steel Water Pipeline & 317m. Delicay River Crossing in Concrete Casing
Modification of Diesel Generator & Various Works 27/06/1970 Modification of Diesel Generator & Various Works MINISTRY OF PUBLIC WORKS General Management of Construction of Airports & Fuel Installations
River Crossing and 8" Dia Pipeline at Osmaniye Kanligecit on Iskenderun-Batman NATO Pipeline 10/07/1970 8" Ø, 2 km. Long Pipeline River Crossing in Concrete Envelope Anchor. with 100-150kg Rocks 8" Ø, 2 km. Long Pipeline River Crossing in Concrete Envelope Anchor. with 100-150kg Rocks
Construction of 6"diam. Crude Oil Pipeline between Silvanka and Garzan 05/10/1970 6"diam., 14,132m. long and 4"diam., 631m. long Crude Oil Pipeline and Water Crossing TURKISH PETROLEUM COMPANY
Installation of cathodic protection devices on 4 liquid fuel systems at various aiports 25/02/1971 Installation of a Cathodic Protection System on Underground Pipelines MINISTRY OF PUBLIC WORKS General Management of Construction of Airports & Fuel Installations
Erection of Transfer Pump & Installation at 6 Storage Fields 07/05/1971 Erection & Manufacturing of Steel Structures MINISTRY OF PUBLIC WORKS General Management of Construction of Airports & Fuel Installations
TURKISH PETROLEUM COMPANY 12/05/1971 Construction of 2 Crude Oil Storage tanks of a Capacity of 2X15,000bbl TURKISH PETROLEUM COMPANY
Disassembling of 15,000bbl Storage Tank at East Raman Transportation to Adiyaman and Re-erection of the Tank 03/09/1971 Erection of Crude Oil Storage Tank with a Capacity of 15,000bbl TURKISH PETROLEUM COMPANY
Construction of Fuel Storage Tanks at Bartin 12/04/1973 Construction of 2 Storage Tanks with a Capacity of 2x6,000bbl & Erection of a Pump Station MINISTRY OF DEFENSE NATO Department Of Infrastructure
Construction of a Crude Oil Storage at Yenikoy Saricak & Pirinclik 10/07/1973 Construction of 2X15,000, 5X5,000 and 1X3,000 Barrel Capacity, Crude Oil Storage Tanks TURKISH PETROLEUM COMPANY
Replacement & Construction of Previous NATO Pol Installation & Channel Crossing Deficient Parts 11/07/1973 Replacement & Construction of Previous NATO Pol Installation & Channel Crossing Deficient Parts MINISTRY OF DEFENSE NATO Department Of Infrastructure
Construction of Menemem-Buruncuk Water Pipeline for İzmir Petroleum Rafinery 13/09/1974 Construction of 2X1000m3 Water Storage Tanks, and 13,526m. Underground & Exposed Steel Pipe and Cathodic Protection Construction of 2X1000m3 Water Storage Tanks, and 13,526m. Underground & Exposed Steel Pipe and Cathodic Protection
Replacement & Construction of Previous NATO Pol Installation Deficient Parts 11/07/1975 Replacement & Construction of Previous NATO Pol Installation Deficient Parts MINISTRY OF DEFENSE NATO Department Of Infrastructure
Construction of a Road between Dörtyol and the Botas Terminal 27/10/1975 Construction of a Road between Dörtyol and the Botas Terminal BOTAŞ Pipeline & Petroleum Oil Transportation Company
Construction of a Water-Pipeline between Ceyhan & Dörtyol 27/10/1975 Construction of a Water-Pipeline between Ceyhan & Dörtyol BOTAŞ Pipeline & Petroleum Oil Transportation Company
Installation of Energy Suplly & Distribution System, Extension for 8 Fuel Storage in Eastern Region 27/10/1976 Manufacturing of a total of 103 Tons of Steel Structural Towers for Overhead Transmission Lines at 34.5Kv.Installation of 8 Transformers & Circuit Breaker Stations & Connections to Underground Lines
Modification of Golcuk Fuel-Storage Units and Renewal of Pelikan Climatization and Pelikan Wire-Fences. 07/02/1986 Modification of Fuel Storage, Climatization, Restoration of the Facilities and Construction of Wire Fences. MINISTRY OF DEFENSE NATO Department Of Infrastructure
Construction of Mersin Free Zone, 2nd Phase. 12/08/1987 MINISTRY OF TRANSPORTATION General Management of RailRoads, Harbors & Airports Construction
Construction of Section 39th + Additional Works. 08/12/1988 Akhisar, Sincan, Cigli Carriage Pulling Systems, Renewal of Compressors at 11 Place, Wire Fence External Lighting, Valve Replacement, Pressure Indicator, Supply and Mounting. Construction of Valve Chamber.
Construction of 1,500 Housing Project for Immigrants in BURSA. 11/09/1994 Construction of 1,575 Apartments in 75 Blocks, Vehicle & Pedestrian Roads, Parking Areas, Water & Sewage Networks, Electronic Distribution System (incl. Transformer Stations), Telephone Networks, Site Grading & Landscaping.